Sample Projects


0900 01.01.2003 0900 ...
Suluova (Amasya) Wastewater Treatment Plant Project 14.10.2005  Population(N2040)=80 000 ,Maximum Flow (Qmax)=204 l/s  Feasibility and Biological Nitrogen Removal Project ...
Typical Wastewater Treatment Plant 15.08.2005

Population:5000 person Qmax=500 m3/d

Population:10000 person Qmax=1000 m3/d

Type:Extended Aeration

...
Altınova (Balıkesir) Wastewater Treatment Plant Project 02.12.2005

Population(N2040):70 000 person

Maximum Flow(Qmax):272,2 l/s

Type of treatment:Biological Nitrogen Remaval

...
Küçükköy (Balıkesir) Wastewater Treatment Plant 09.03.2007

Population(N2041):250 000 person

Maximum Flow(Qmax):1720 l/s

Type of treatment :Biological Nitrogen and Phosporus removal

...
Elmalı(Antalya) Wastewater Treatment Plant 23.11.2007

Population(N2042):35000 person

Maximum Flow(Qmax):95 l/s

Type of treatment:Biological Nitrogen and Phosphorus removal

...
Antalya Lara Park Konakları 20.09.2007 Lara Park konakları altyapı projeleri ...
Ahlat(Bitlis) Wastewater Treatment Plant Project 17.03.2004

Population(N2039):110 000 person

Maximum flow(Qmax):385 l/s

Type of treatment:Biological nitrogen removal

...
İstanbul Metrocity Complex 01.04.2005 Steel construction manufacturing of swimming pool,fitness center and entrance of shopping center ...
Antalya Lara Delphin Otel 01.03.2004 Steel construction dome manufacturing ...